New spring intake built with flowrate sufficient to increase community water by 300%
-
1.4km of new transmission pipeline built
-
Water reservoirs built in three locations with total capacity of 30,800L which community can manage during drought
-
5km of new distribution pipeline and rehabilitation of some existing distribution network to minimize water losses
-
10 new public tapstands built and 16 existing tapstands rehabilitated to ensure water access to entire suco