Created at: 15 May 2022
Description
-
Expansion of transmission network, connecting another spring to the existing spring box via new 800m piping, more than tripling total volume of water available to community per day
-
Two steel cable pipe bridges installed along transmission line to ensure secure passage across river sections
-
Rehabilitation of weak sections of existing transmission line to community
-
Construction of two new 5200L reservoirs in community for additional storage during dry season
-
New distribution network (2.2km of pipe) with 5 public tapstands built in aldeia Mausuka, which previously had to walk long distances for water
-
Steel cable pipe bridge installed in new distribution network to allow new pipeline to safely traverse 30m river