Created at: 15 May 2022
Description
-
Rehabilitation of existing cracked spring intake and leaking transmission lines to maximize flowrate available to community
-
Construction of new 10,000L ferrocement tank to allow community to carefully manage their water during times of drought
-
Construction of 12 new public tapstands and connections to distribution network through a total of 1800m of pipe, to ensure entire equal access to water within the village