Construction of intake for uncapped spring and new piping from new intake to existing intake to increase total flowrate available to community during dry season
-
Rehabilitation of transmission pipeline, including replacement of 550m and replacing fittings for remaining sections
-
Installation of two new tanks with total capacity of 10,400L, connected with existing tank in parallel, to allow the community to store and manage large volumes of water during droughts
-
2.2km of new distribution pipeline
-
Construction of 6 new public tapstands and rehabilitation of 15 existing tapstands to ensure all houses in suco have adequate access to water