Bridge along evacuation route with improved erosion protection standard

East-Timor - Temporary

Created at: 15 May 2022

Description

  1. Demolition of existing, heavily eroded and hazardous, bridge structure

  2. Rehabilitation of bridge foundations and wings to become erosion resilient and safely support load of new concrete deck

  3. Reinforced concrete deck of 5m span and 4.5m width girders embedded

  4. Safety rails constructed on deck edges