Pouembout 250 p.e.

Constructed Wetlands: Groundwater Treatment Plants (GWT)

Created at: 25 Aug 2016

Description

Pouembout : a 250 p.e. reed bed filter was created to replace a deficient waste stabilization pond.<br><br>Additional Info<br>In operation since: 2008<br>Type of wastewater treated : Domestic<br>Hydraulic load: 70 m3/d<br>Organic load (PE): 250 PE<br>Organic design load (kg BOD/day): 14<br>Location : New Caledonia<br>Client : Town of Pouembout<br>Stage 1 type : Vertical flow reed bed system (French system)<br>Stage 1 surface area (m²): 190<br>Stage 2 type: Horizontal flow, saturated<br>Stage 2 surface area (m²): 375<br>Stage 3 type: infiltration basin<br>Cost: 129,000.00 €<br>Designed by SINBIO

Help us provide more detailed information about this project by contributing!


Related projects

Below you will find the latest related projects in this category.

Show more related projects →

View all Water projects →