Bezannes

Constructed Wetlands: Groundwater Treatment Plants (GWT)

Created at: 25 Aug 2016

Description

Bezannes : a 8000 m² artificial pond plus 3500 m² of reed bed filters and 1600 m² of wetlands were created to treat stormwater runoff from a large non-residential area. <br><br>Additional Info<br>In operation since: 2011<br>Type of wastewater treated: Stormwater (runoff)<br>Max. Hydraulic load: 15 000 m3<br>Watershed: 1 720 000 m²<br>Location : Bezannes, Champagne Ardennes TGV station, FRANCE<br>Client: REIMS METROPOLE<br>Stage 1 type: artificial pond<br>Stage 1 surface area (m²): 8000<br>Stage 2 type: reed bed filter<br>Stage 2 surface area (m²): 3500 <br>Stage 3 type: surface flow wetland<br>Stage 3 surface area (m²): 1600<br>Cost: 4,800,000.00 €<br>Designed by SINBIO

Help us provide more detailed information about this project by contributing!


Related projects

Below you will find the latest related projects in this category.

Show more related projects →

View all Water projects →