Allenwiller 1100 p.e.

Constructed Wetlands: Groundwater Treatment Plants (GWT)

Created at: 25 Aug 2016

Description

Allenwiller : a 1700 m², vertical flow reed bed (French system) plus a 960 m² second stage unsaturated vertical flow reed bed filter, treating 495 m3/d of domestic effluent from three villages (1100 PE) in Alsace. <br><br>Additional Info<br>In operation since: 2005<br>Type of wastewater treated: Domestic<br>Hydraulic load: 495 m3/d<br>Organic load (PE): 1100 PE<br>Organic design load (kg BOD/day): 60<br>Location: Allenwiller, Bas Rhin, FRANCE<br>Client: Communauté de Communes de la SOMMERAU (Bas-Rhin)<br>Stage 1 type: Vertical flow reed bed system (French system)<br>Stage 1 surface area (m²): 1700<br>Stage 2 type: Vertical flow, unsaturated<br>Stage 2 surface area (m²): 960 m²<br>Cost: 450,000.00 €<br>Designed by SINBIO

Help us provide more detailed information about this project by contributing!


Related projects

Below you will find the latest related projects in this category.

Show more related projects →

View all Water projects →